Monday saw us re-tiling in the men's room -- some tiles pulled loose from their mortar. Before we got to that, though, the last of the old drains were capped-off. Several new valves were installed on various lines to give some cut-offs in needed places. Then, we closed off the room so the tiles could set, and we could get back in for other work on Wednesday.
In the front room, the wainscoting went up after the electrical boxes were put in place. The walls and door frame were painted. The front windows were removed, the protective grates taken off and the broken windows replaced. Some repainting was also done on the windows by Amos, a church member who came to help. The ceiling lights were re-wired and new switches installed, in preparation for the new suspended ceiling which we hope to start on Tuesday.
After dinner, Kevin left for home. Pastor John, Florence his wife and Sammy his son joined us for our evening meal, along with Bernardo and others from the church family. Before we went to bed we had heard from Kevin that he had made it home safely.
Mouse count: 4.
Tuesday, April 21, 2009
Subscribe to:
Post Comments (Atom)
1 comment:
It is very encouraging to both see and read of the progress you all are making at Casa del Pueblo.
From my perspective prayer works.
From your perspective prayer result is work - your work!
Post a Comment